Mandarin Oriental Hotel Palace

Switzerland
2021

The historic hotel is being brought up to date from a building technology perspective. The heating of the house is now generated via reversible seawater heat pumps. Peak load is covered by gas. The building model was created using a building scan so that technical coordination can be carried out using BIM.

Combining old and new

Innovation meets
on history

The Hotel Palace Luzern, which opened in 1906, is a true icon. Located on the shores of Lake Lucerne, the building's majestic façade simply captivates you.

  • icon project

    description

    total renovation of Hotel Palace

  • icon development

    client

    First Swiss Hotel Collection AG, Lucerne

  • icon W&P

    W&P Engineering

    Planning of the entire building technology for heating, ventilation, sanitation and air conditioning.
    technical coordination with BIM

Other projects